1. Redesign & Pilot (Days 31-60)¶
Purpose
In days 31-60, redesign the work process around AI and build and test the first pilot in operations.
Theme: Build, Test and Learn.
We are going to build and test. Not in isolation, but in operations. We redesign the work process around the AI.
1. Objectives¶
- Validation Pilot: Prove that the chosen use case works in practice.
- Process Redesign: Adapt the work process. Adding AI to a bad process only makes it faster at being bad.
- First win: Realise measurable savings or revenue growth.
2. Activities¶
- Sprint execution: Build/configure the solution (PoV) in 2-4 weeks.
- Workflow Redesign: Redraw the process as if AI is a team member (H3 level).
- User Training: Train the pilot group not just on the buttons, but on the new way of working.
- Measurement: Start baseline and effect measurement.
3. Deliverables (Day 60)¶
Phase 2 Deliverables
- Working prototype / PoV in the hands of users.
- Adapted process description (SOPs).
- First results report (e.g. "30% time saving on task X").
- Go/No-Go decision for scaling.
Next step: Proceed to Phase 3 — Codify & Scale (Days 61-90) → See also: Validation phase
Was this page helpful?
Give feedback